Critical Path Method Best Practices. The success of any construction project relies on the scheduling process and the prioritization of tasks. This starts with identifying the most important jobs and assigning resources and responsibilities, which is where the Critical Path Method (CPM) comes into play.
Simply put, the critical path is the journey between the start and finish of your project. It’s the method you use to determine how long each required task takes before it’s finished, and includes project phases and the time periods for each phase, along with the project tasks and duration. CPM lets you identify potential delays and setbacks before they become an issue, and highlights any additional resources that can be used to move things along.
Determining each project’s CPM requires several steps. After you’ve worked out these steps, you can apply the data points to the CPM to lay out your project timeline.
Even if you’re familiar with CPM, project managers can still apply the following best practices to help ensure success.
Whether you’ve managed one construction project or a thousand, you know that things don’t always go as planned. Your critical path needs to allow for a pivot in the case of any delays or setbacks throughout the project timeline; just try a little experimentation to see what impact they may have.
Keep this in mind: Slack is defined as the amount of time a task can be delayed without any delay in the project finish date. Free slack is the time a task can be delayed without delaying its successor task.
Staying flexible is as important as accounting for the “what if” scenarios that involve changing slack. Critical paths can change as the project continues depending on delays, resource availability, and other issues that may arise. Because you’ve already measured task duration while planning your critical path, your new duration can be easily adjusted after a delay.
Once you’ve planned your critical path, run it by everyone on the team — including investors, team members, contractors, and other decision-makers. It’s crucial for the construction project’s success that everyone’s on the same page throughout the entire process. This encourages communication, collaboration, and overall teamwork.
Now that the critical path is set and approved, the project manager needs to look at it as less of a “to-do” list and more of a collaboration tool to share with everyone on the team. All task deadlines should be specific and delegated to the right person. This gives the project manager a big-picture look at understanding workloads and if they’re appropriate for the delegated team member.
Status reports (also known as milestone reports) are updates that let everyone know how things are going. Make sure each status report includes the overall progress of your project, milestones that are completed and upcoming, and any issues that you’re facing.
Any major project will have both tasks that need to be accomplished end-to-end and others that can be undertaken simultaneously. CPM scheduling identifies each step but also takes into account the best-case scenarios, likely scenarios and worst-case scenarios for each step.
At TD Wilson, we use only the best CPM software tools: Primavera P6 and P3, SureTrak (ST) and MS Project. All are highly rated and capable of delivering comprehensive reports and sophisticated analysis.
Request an initial consultation on your project.
Navigation
| Thomas D. Wilson Consulting, Inc.
(314) 918-0210 | tom@tdwilson.com |
1750 S Brentwood Blvd, Suite 307, Brentwood, MO 63144